Six stages from enquiry to shipment, with capacity checked before anything is committed.
Drawings reviewed and current scheduled load checked. If we cannot hold your date, we say so now.
Piece price, setup and changeover shown separately, with the committed delivery date stated.
Written per job with photographs, so the build is repeatable by any trained operator.
Inspected and recorded before the run proceeds, with the record supplied to you.
Run against the schedule with in-process checks and traceable records.
Packed to specification with inspection and test records travelling with the goods.
Monthly, against committed dates, including the months we missed.
Where the schedule cannot be held, we say so before you commit.
Every new part number, with records supplied.
Inspection and test data travels with the goods.
Setup and changeover time shown separately, not buried in the piece price.
No agency labor on the assembly floor.
We will check scheduled capacity against your date and tell you honestly whether we can hold it. No charge for the assessment.
Get in touchCheck capacity, quote honestly, document the process, inspect the first article, run, ship with records.
Missed deliveries are investigated and appear in the published monthly figure with the cause.
We will tell you when another shop is better suited, which happens most often on very large volumes.
Declining work costs us revenue and protects customers from a date we cannot hold.