Industrial Manufacturing

How a job runs

Six stages from enquiry to shipment, with capacity checked before anything is committed.

Our process

How a job runs

Enquiry & capacity check

Drawings reviewed and current scheduled load checked. If we cannot hold your date, we say so now.

Quotation

Piece price, setup and changeover shown separately, with the committed delivery date stated.

Work instructions

Written per job with photographs, so the build is repeatable by any trained operator.

First article

Inspected and recorded before the run proceeds, with the record supplied to you.

Production

Run against the schedule with in-process checks and traceable records.

Pack and ship

Packed to specification with inspection and test records travelling with the goods.

Why us

Why choose Assembly Point Services

On-time rate published

Monthly, against committed dates, including the months we missed.

We decline work

Where the schedule cannot be held, we say so before you commit.

First-article standard

Every new part number, with records supplied.

Records with the shipment

Inspection and test data travels with the goods.

Quoted changeover

Setup and changeover time shown separately, not buried in the piece price.

Direct labor only

No agency labor on the assembly floor.

Send us drawings and a date

We will check scheduled capacity against your date and tell you honestly whether we can hold it. No charge for the assessment.

Get in touch

Our Method

Check capacity, quote honestly, document the process, inspect the first article, run, ship with records.

Missed deliveries are investigated and appear in the published monthly figure with the cause.

Working Together

We will tell you when another shop is better suited, which happens most often on very large volumes.

Declining work costs us revenue and protects customers from a date we cannot hold.